ArticlesPractical guides to quantitative risk analysis
Monte Carlo simulation, cost and schedule risk, sensitivity analysis and decision analysis, explained for people who build the models, many with a worked example or a free workbook.
Articles
Guides, worked examples and comparisons
Newest first. Pick a topic or search the titles and summaries.
-

ModelRisk
Stochastic Optimization in Excel: What It Is, How It Differs from Solver, and a Worked Example
Stochastic optimization explained: how it differs from Solver, what to optimize when inputs are uncertain, and a worked example with an efficient frontier.
-

ModelRisk
Did Norway Really Fix Cost Overruns? P50 and P85 Budgets Scored
Since 2000 Norway has budgeted big state projects at P85, with a P50 to manage to. We scored the results as a forecast, beside Denmark. Back-test your own.
-

ModelChoice
Expected Monetary Value (EMV): the Formula, a Risk Register Example and a Decision Tree
Expected monetary value (EMV) explained: the formula, a worked risk register example, EMV in a decision tree, what the PMP exam asks, and where EMV misleads.
-

ModelRisk
Monte Carlo Simulation Software: How to Choose the Right Kind for Your Model
Monte Carlo simulation software comes in five kinds: plain Excel, Excel add-ins, schedule risk tools, standalone simulators and code. Which fits your model?
-

ModelRisk
Test the ModelRisk Optimizer on Ten Problems with Known Answers
Ten optimisation problems with uncertain inputs and known best answers. See how fast the ModelRisk Optimizer solves them, then test your own optimiser.
-

Tamara
Monte Carlo Simulation in Project Management: S-curves, P80 Dates and Tornado Diagrams
Monte Carlo simulation for project schedules: how to read S-curves, P50 and P80 dates and tornado diagrams, with a live simulation and PMP exam notes.
-

Tamara
Three-Point Estimating: the PERT and Triangular Formulas, with a Calculator
Three-point estimating explained: the PERT and triangular formulas, standard deviation, a free calculator with P80, and how to add estimates up correctly.
-

ModelRisk
Sensitivity Analysis in Excel: One-Way Tables, Tornado Charts and Data Tables
How to do sensitivity analysis in Excel step by step: a one-way table, a tornado chart and a two-way Data Table, with a free NPV workbook to download.
-

ModelRisk
Qualitative vs Quantitative Risk Analysis: Four Risk Managers, One Project
Four risk managers and Trevor, one €10m project, the same luck. We simulated 10,000 years to see what qualitative and quantitative risk analysis change.
-

Tamara
Primavera Risk Analysis Alternative
Looking for a Primavera Risk Analysis alternative? What a replacement must do, how to move your P6 schedule risk model across, and what Tamara costs a year.
-

ModelRisk
Monte Carlo Simulation in Excel: a Step-by-Step Guide
How to run a Monte Carlo simulation in Excel step by step: plain formulas (RAND, NORM.INV, a Data Table) or an add-in, with a free workbook to download.
-

ModelRisk
Is the Hot Hand Real? The Fallacy, Simulated
A famous 1985 study called the hot hand a myth. Its way of measuring streaks was biased: simulate it, and a real hot hand looks like no hot hand at all.
-

ModelRisk
Fitting Distributions to Data in Excel
How to fit probability distributions to data in Excel: ranked candidates, AIC and SIC explained, and a Johnson SU worked example you can download and check.
-

ModelRisk
Cost Risk Analysis: Methods, Models, Outputs
What cost risk analysis is, the methods that work, and the outputs a board can fund: S-curves, tornado charts and a defensible P80 contingency in Excel.
-

ModelRisk
Sensitivity Analysis in Excel: Tornado Charts Done Right
What a tornado chart shows and how to make one in Excel: a worked Monte Carlo example, the three traps that make the bars lie, and a free model to check.
-

ModelRisk
@RISK Alternatives: Honest Comparison
The realistic @RISK alternatives compared honestly: features, speed, prices with sources, who should switch and who should stay - plus a free converter.
-

ModelChoice
PrecisionTree Alternative: Honest Comparison
Looking for a PrecisionTree alternative? Decision trees, Bayes revision and value of information compared honestly, with sourced prices and a free trial.
-

ModelRisk
How Many Monte Carlo Iterations Do You Need?
Race four aircraft boarding methods in Excel, then run it 3,000 times. A free workbook showing why one simulation run is an anecdote, and how many you need.
-

ModelRisk
Risk Analysis Software: What It Does and How to Choose
What risk analysis software does, the four types it comes in, what it costs, and how to choose the right one for cost, schedule or decision risk analysis.
-

ModelChoice
What Is Information Worth? A Worked EVPI and EVII Example
Value of information explained with a worked example: what perfect information (EVPI) is worth, what a real test (EVII) is worth, and when to buy one.
-

ModelRisk
AI + Monte Carlo Simulation in Excel: ModelRisk MCP
ModelRisk MCP connects AI assistants directly to Monte Carlo simulation in Excel: the assistant builds, fits and runs the model - it does not just advise.
-

ModelRisk
The Number Your Forecast Is Hiding
Every single-point forecast hides its own probability. How to find the real chance of hitting the number - and what to do when it is lower than you think.
-

ModelRisk
Before You Renew @RISK: A 10-Minute Audit
Renewing @RISK? Run this 10-minute audit first: what you pay, what you actually use, and what the same budget buys elsewhere — free model converter included.
-

Tamara
Primavera P6 Schedule Risk Analysis: A Practical Guide
How to run a Monte Carlo risk analysis on a Primavera P6 schedule and set schedule contingency from the P80 date: uncertainty, risk events and key charts.
-

ModelRisk
Frequency-Severity Modelling in Excel: A Practical Guide
Frequency-severity modelling explained: pick the frequency and severity distributions, build the aggregate loss distribution, and read premiums and capital.
-

ModelRisk
How to Calculate Cost Contingency (P50, P80)
Step-by-step cost contingency calculation with Monte Carlo simulation: a worked €12m example, P50, P80 and P90 compared, and a free model to check it with.
-

ModelRisk
How Much Does @RISK Cost? Pricing and Alternatives in 2026
Lumivero lists @RISK at €2,900–€3,500 per year in its web shop (August 2026). What drives the real cost, and how the main @RISK alternatives compare.
-

ModelRisk
ModelRisk vs Oracle Crystal Ball: 2026 Comparison
ModelRisk vs Oracle Crystal Ball for Monte Carlo simulation in Excel: methods, fitting, pricing and migration compared — free 15-day trial included.
-

ModelChoice
Top 7 Decision Analysis Tools Compared
Decision tree and decision analysis software compared: ModelChoice, PrecisionTree, DPL, Analytica, TreeAge, TreePlan and the free SilverDecisions, with prices.
-

ModelRisk
5 Best Risk Analysis Add-Ins for Excel
Compare the top 5 Monte Carlo risk analysis add-ins for Excel — ModelRisk, @RISK, Crystal Ball, Analytic Solver and RiskAMP — features and 2026 prices.
-

Tamara
6 Best Project Risk Analysis Tools
Compare 6 project risk management tools for QSRA: RiskyProject, Acumen Risk, Safran Risk, Tamara and two more, scored on usability, capability and price.
-

IDW PS 340 software requirements
What IDW PS 340 n.F. (2020) requires of risk management software: quantitative risk aggregation, documented methods, traceability and audit-ready reports.
-

Monte Carlo Simulation
Monte Carlo simulation explained step by step: what it is, how it works, and how to read the results — with clear examples from risk analysis practice.
No articles match .
More ways to learn
Webinars, models, videos and training
Webinars and events
Live online introductions, masterclasses and the Quantitative Risk Virtual Summit.
See the datesExample models
Free Excel models, with the results explained.
Browse the modelsVideo tutorials
Short ModelRisk videos, from your first model to advanced features.
Watch the videosRisk analysis training
Courses in risk analysis and in our software, from first steps to masterclasses.
See the trainingTry the methods on your own model.
Free 15-day trials of ModelRisk, ModelChoice and Tamara. Not sure which one fits your problem? Our team can help.