Leading Indicator Forecast with Uncertainty | Vose Software

ModelRisk example · General techniques

Forecast from a Leading Indicator

Can this year's building permits forecast next year's cement sales? A forecast from a leading indicator.

  • Complexity: ★★★★★
  • Free Excel workbook (GU-14)
  • Needs ModelRisk: free trial

From the model’s saved run

The lead and the line

From the Data and Forecast sheets.

MeasureUnitValue
Lead with the highest R²months11
Lead used (Inputs sheet)months11
R² at the lead used0.971
Standard error of a forecast monthkt0.164
Cement sales forecast — 10th / 50th / 90th percentile band

The business question

A cement supplier wants to plan its production for the coming year. Construction starts a while after a building permit is issued, so permits ought to tell it something about future cement sales. It has 90 months of both.

Comparing sales with permits issued 0 to 20 months earlier shows one lead that fits far better than the others: sales follow permits by about eleven months. A straight line through those pairs explains most of the variation in sales, and because the permits for the next eleven months' sales have already been issued, they give a forecast with only the line's scatter as uncertainty.

Who it is for
Forecasters with an indicator that moves ahead of the quantity they need: orders, permits, enquiries, claims notified.
Main outputs
R² of the relationship for every lead from 0 to 20 months · the fitted line and its scatter · sales in each of the next eleven months at P10 / median / P90, and their total.

How the model works

Four sheets after this one, read from left to right. Each one feeds the next.

  1. Inputs sheet

    The lead in months, chosen from the table of R² on the Data sheet (11 for these data).

  2. Data sheet

    The history, and for every lead from 0 to 20 the R² between permits and the sales that many months later. INDEX picks the matching ranges, so the table needs no OFFSET.

  3. Forecast sheet

    SLOPE, INTERCEPT and STEYX of sales on permits at the chosen lead. Each forecast month's sales are VoseNormal(slope × the permits issued 'lead' months earlier + intercept, STEYX).

  4. Results sheet

    The best lead and its R², the fitted line, and the forecast's percentiles and band.

ModelRisk techniques

  • Lagged regression SLOPE, STEYX
  • Best lead by R²
  • Normal forecasts VoseNormal
  • Forecast output range

Find similar models

Product
Application
Uses

The results in detail

Sales forecast

Sales in months 1, 6 and 11, and over all eleven.

MeasureUnit10th pctMedian90th pctMean
Month 1kt5.035.245.465.24
Month 6kt5.415.625.835.62
Month 11kt6.276.486.696.48
Eleven monthskt62.663.364.063.3

How to read these results

  • R² rises to about 0.97 at a lead of eleven months and falls away on both sides: sales follow permits by about a year, and at the right lead the line explains almost all of their variation.
  • Because the permits for the next eleven months' sales have already been issued, the forecast needs no forecast of the indicator: its only uncertainty is the scatter around the line, about 0.16 kt a month.
  • Permits rose steeply over the last year, so the line forecasts sales rising from about 5.2 to about 6.5 kt a month: a jump from the 4.5 to 5 kt of recent months that the permits already issued make likely.
  • Beyond eleven months the permits are not yet known; a longer forecast would need a forecast of permits, with its own uncertainty.

See it move. Open the workbook, change an input on the Inputs sheet and run the simulation: every table and chart on this page updates in Excel.

Inputs and assumptions

Every assumption in the model, with its uncertainty and where it comes from. The figures are illustrative.

The lead 1 input

How many months sales follow permits. Read it from the R² table on the Data sheet.

AssumptionUnitValue
Lead used for the forecastThe highest R² for these data. The forecast table needs a lead of at least 11.months11

Units and conventions

Permits
Building permits issued per month.
Sales
Cement sales, thousand tonnes per month.
Lead
Sales in month t are compared with permits in month t − lead.
Months
Month 0 is the last month of data; months 1 to 11 are forecast.

Key assumptions and limitations

Linear
Sales are a straight-line function of permits issued 'lead' months earlier, plus Normal scatter.
Stable
The relationship and the lead stay as they were over the 90 months.
Known parameters
The line's slope and intercept are taken as known: with 79 pairs and R² near 0.97 their uncertainty is small next to the scatter.
Data
The 90 months of data are those of ModelRisk's earlier Leading Indicator example.

How to use it

  1. Replace the history on the Data sheet with your own indicator and quantity.
  2. Read the R² table, and set the lead with the highest R² on the Inputs sheet (11 or more for this layout).
  3. Run a simulation from the ModelRisk ribbon (10,000 samples with a fixed seed are set).
  4. Plan on the band, not the line: the scatter around the line is the forecast's uncertainty.

ModelRisk functions used

RSQ, SLOPE, INTERCEPT, STEYX (Excel)
The relationship's strength, its line and the scatter around it.
VoseNormal
Each forecast month's sales around the line.
VoseOutput
The eleven forecast months as an output range, and their total.
VoseSimPercentile
The forecast's percentiles and band.