Wastewater Aeration: Blower Staging

How many blower steps per basin minimise the worst-case energy bill while keeping oxygen safe 95% of the time?

  • Complexity: ★★★★★
  • Free Excel workbook
  • Needs ModelRisk with the Optimizer

The optimisation problem

Lowest mean of the worst 10% of energy bills

Decide
Blower steps for 4 basins, 0 to 8
Goal
Lowest mean of the worst 10% of energy bills
Limit
At most a 5% chance any basin’s oxygen falls below 2.0 mg/L
Engine
Vertex Detector

What the Optimizer found

Starting planOptimizer’s plan
Basin 136
Basin 237
Basin 336
Basin 436
Goal: Mean of the highest 10% of energy cost ($)462963
Limit: Chance lowest basin O2 is at or below 2, at most 5%100% not met4.0% met

ModelRisk Optimizer run on 13 Oct 2026: the Vertex Detector engine, with Turbo simulation, tried 350 plans, each simulated with 10,000 samples, in 3 seconds. Both plans above were then simulated again with the same 10,000 samples.

What the workbook models

Four aeration basins face an uncertain influent load (lognormal). Blowers add dissolved oxygen but draw energy whose price also varies. You choose integer blower steps per basin.

Decision, objective and constraint

Decision
4 integer blower-step counts, each 0 to 8
Objective
Minimise the CVaR of energy cost: the mean of the worst 10% of bills
Hard constraint
probability that any basin's oxygen drops below 2.0 mg/L ≤ 5%

The engine: Vertex Detector

A tail-risk (CVaR) objective plus a chance constraint over integers then Auto then Vertex Detector.

The model

Stage integer blower steps per basin to minimise the upper-tail (CVaR) energy cost while keeping dissolved oxygen above the minimum 95% of the time.

InputDecision (the Optimizer changes it)Calculated or uncertain (sampled each iteration)Objective

Parameters

Energy $/step34.00
O2 transfer per step0.60
Min dissolved O22.00

Units (decision highlighted)

BasinBlower steps (dec)Influent load (unc.)O2 deliveredEnergy $
Basin 13uncertaincalculateduncertain
Basin 23uncertaincalculateduncertain
Basin 33uncertaincalculateduncertain
Basin 43uncertaincalculateduncertain

Results

Energy cost ($): objectivecalculated
Lowest basin O2: constraintcalculated

Decision cells hold starting values: the workbook opens at the starting plan above, and the Optimizer finds its plan when you run it. The figures are illustrative.

Run it yourself. Open the workbook with ModelRisk, open the Optimizer from the ribbon (the saved task opens with it) and press Start.

Glossary

CVaR