Measures of risk - Conditional Value-at-Risk (CVaR)

See also: Insurance and finance risk analysis modeling introduction, Measures of risk - Value at Risk

 

Conditional Value-at-Risk (CVaR) is also known as Expected Shortfall (ES), Average Value-at-Risk (AVaR) ad Expected Tail Loss (ETL). CVaR is superior to VaR because it satisfies all the requirements for a coherent risk measure (Artzner et al, 1997) including subadditivity.

ModelRisk’s CVaR functions use the convention that the underlying variable is a distribution of loss. It then calculates the mean loss conditional on the loss exceeding the threshold value T, or the losses in the top fraction P of the distribution, as appropriate. If f(l) and F(l) are the probability density the cumulative distribution functions for the loss distribution L at value l, then at the target value T (where ), we have:

 


Note

If your model is simulating the distribution of profit, simply enter negative this distribution as an input to the VoseCVARx or VoseCVARp functions.

Example

Assume losses as following a Normal(20,10) distribution, being simulated in cell A1 using the formula “=VoseNormal(20,10)”. Also assume the P value of interest to be 5%, i.e. that we are interested in the highest 5% of possible losses.

The VaR (value at risk) is just the 95th percentile (1-5%) of the normal distribution. This could be calculated directly as VoseNormal(20,10,1-5%) if the entire model was just the one distribution. More commonly, however, cell A1 would represent the simulated loss of a more complex model, in which case we can get the VaR value using:

            =VoseSimPercentile(A1,1-5%)

Again, if the entire model was just the one distribution, the CVaR could be calculated directly as:

            =VoseMean(VoseNormalObject(20,10,VosePBounds(1-5%,))

However, more normally cell A1 would represent the simulated loss of a more complex model, in which case we can get the VaR value using:

=VoseSimCVARp(A1,5%)

The 95th percentile of a Normal distribution equals 36.44854.. We can define the CVaR using this threshold value too:

           =VoseSimCVARx(A1, 36.44854)
 

 

ModelRisk

Monte Carlo simulation in Excel. Learn more

Spreadsheet risk analysis modeling

Tamara

Adding risk and uncertainty to your project schedule. Learn more

Project risk analysis

Navigation

Enterprise Risk Management software (ERM)

Learn more about our enterprise risk analysis management software tool, Pelican

Enterprise risk management software introduction

FREE MONTE CARLO SIMULATION SOFTWARE

For Microsoft Excel

Download your free copy of ModelRisk Basic today. Professional quality risk modeling software and no catches

Download ModelRisk Basic now

FREE PROJECT RISK SOFTWARE

For Primavera & Microsoft Project

Download your free copy of Tamara Basic today. Professional quality project risk software and no catches.

Download Tamara Basic now